Nail Under a Sealed Shingle
Driving a nail into the covered nailing zone of a shingle without bending back the brittle course above it.
Shingles, flashing, gutters, and tracking down leaks.
17 techniques
17 shown
No techniques match. Try removing a filter or shortening the search.
Driving a nail into the covered nailing zone of a shingle without bending back the brittle course above it.
Placing shingle nails so the water channeling down every butt joint above never crosses a nail hole.
Leaving the siding joint over head flashing uncaulked — it's the drainage exit for water that gets behind the siding.
The flashing at the bottom of a roof-to-sidewall run that diverts runoff into the gutter instead of down the siding.
Slipping a flashing piece behind each siding butt joint instead of relying on caulk.
Pitching a rough sill with a back dam so water that gets past the window drains out instead of soaking the framing.
An upside-down Y where a downspout enters a buried drain line, giving meltwater an exit at grade when the underground run freezes.
Building the offset in place instead of by formula, nesting each section into the one below, and keeping screws out of the water’s path.
Clearing gutters from the ground with a leaf blower and an extension pipe hooked over the gutter edge.
Primer, seam tape and sealant with geotextile bedded in, so the patch flexes with the roof instead of cracking at the edge.
Why a structural sheet's long dimension has to run across the rafters or joists it spans, and what happens to the deck when it doesn't.
Folding trim coil to a crisp straight line in place — a light knife score and a block instead of a brake.
Getting the pitch of a roof or ramp with a speed square and a level — or a hanging chalk line as the plumb reference.
Snapping a two-end chalk line so finish fascia installs dead straight over imperfect framing.
The two rafter angles: the plumb cut matches the pitch angle, the heel cut is its 90-degree complement, plus the bevel when meeting an existing roof.
Laying out a common rafter's plumb, seat, and tail cuts with an oversized square — the pitch scale for plumb, the slot for level.
Offset blocks, a string line, and a gauge scrap that pull a long fascia run dead straight when there are no rafter tails to cut to a line.
Or start from the whole library: browse all 526 techniques · search by tool, material, or problem