Foam Dam for Self-Leveler
Sealing subfloor holes with big-gap expanding foam before a self-leveler pour, trimmed flush the next day.
Wall-primer overspray dries into a film nothing bonds to — wet it, scrub it off, and get back to bare subfloor before priming for self-leveler, or the leveler's primer bonds to the overspray instead of the floor.
self leveler not sticking, leveling compound peeled up, paint on the plywood before tiling, floor prep after spraying walls
Spray-priming walls leaves a fog of overspray on the subfloor. It looks like nothing — a faint film you'd wipe at with a sponge and forget. But dried wall primer is a bond-breaker on a floor: when you later prime the subfloor for self-leveling compound, that primer bonds to the overspray film, not the wood. The film peels, and everything on top of it — leveler, uncoupling membrane, tile — can delaminate. At that point the membrane gets blamed for a failure the overspray caused.
The fix costs fifteen minutes, and this creator did it on camera on his own mistake:
He's blunt that plenty of professional installers skip this step. The wipe-with-a-damp-sponge version doesn't count — it smears the film around without removing it.
DIYsolvr helps you find the best DIY videos. Browse all 526 techniques