Frame a Door Opening
Header, jacks, kings, and cripples — and the door-plus-two math that sizes the rough opening.
Keep butt joints at least one joist bay apart (two is better), leave the code-required 1/8-inch gap at every joint so swelling panels push sideways instead of up, put adhesive on every joist, and fasten five per joist per sheet — two at the ends, three in the field.
squeaky floor prevention, subfloor gap spacing, osb this side down stamp, ring shank vs screws subfloor, subfloor seams lifting, tongue and groove osb
Subfloor fails in slow motion: panels butted tight swell with moisture and have nowhere to go but up, fasteners without ridges or threads back out over years of deflection, and butt joints stacked in a line make a hinge across the floor. All three mistakes are invisible under flooring until they're squeaks and humps.
3/4" tongue-and-groove subfloor panels (OSB or plywood — OSB is cheaper, both work), subfloor adhesive in sausage or cartridge tubes, and ring-shank nails or subfloor screws.
DIYsolvr helps you find the best DIY videos. Browse all 526 techniques