The Problem
A wandering nail row on sheathing means misses — fasteners that skip the stud or joist below and hold nothing. Snapping a chalk line for every row fixes it, but on a full sheathing job that's a lot of snapping.
The Technique
- Look closely at the face of the sheet. Sheathing plywood carries faint, dead-straight parallel lines from manufacturing, spaced about every half inch across the sheet.
- Drive your first nail into the framing at one edge of the sheet and your last at the other, locating the stud or joist as usual.
- Pick the mill line that runs through (or nearest) both nails, and follow that one line for every nail between them.
The line does the job of a chalk line that's already printed on the sheet — you're only borrowing it once your row is registered on the framing at both ends.