Gauge Electrical Box Stickout With the Side of Your Lineman's Pliers

An electrical box on a stud has to sit proud by exactly the drywall thickness. The head of a lineman's pliers is 5/8 of an inch thick — hold it flat against the stud and set the box flush to it for 5/8 drywall.

outlet box sticks out too far, electrical box set too deep, box depth for sheetrock, junction box flush with the wall

beginner Tools: lineman's pliers Added Jul 28, 2026

The Problem

An electrical box mounted during rough-in has to stick out past the stud face by exactly the thickness of the drywall that's coming — flush with the finished wall, not buried behind it or proud of it. Eyeballing it works until it doesn't, and a box set wrong means spacers or a mud ring fix later.

The Technique

An electrician's no-extra-tool gauge: the head of a lineman's pliers is 5/8 of an inch thick — the same as 5/8 drywall.

  1. Hold the pliers flat against the stud face beside the box location.
  2. Set the box so its front edge lands flush with the face of the pliers head.
  3. Fasten the box. When the 5/8 board goes on, the box lands exactly flush.

The pliers are already in your hand for the rest of the rough-in, which is the whole charm — the depth gauge is the tool you were holding anyway.

Pro tip: Head thickness isn't a published spec — check your own pliers against a tape once before trusting them as a gauge, and remember the trick calibrates to 5/8 board. For 1/2-inch drywall, most side-mount boxes have molded depth ribs on the side that mark common stickouts; use those instead.

Electrical, plumbing, and structural work may be regulated where you live — check local code before you start, and note that a permit may be required. More in our disclaimer.

DIYsolvr helps you find the best DIY videos. Browse all 526 techniques