The Problem
Every wall of the house stands on the floor platform, so an out-of-square
platform sends its error up through the whole build. The squaring, the rim
joist nailing, and the joist layout each have a specific order and a
specific rule, and they're cheap to get right at this stage and expensive
after.
The Technique
- Square the mud sill by the diagonals. Measure corner to corner both
ways. If one diagonal reads 67-3/4" and the other 67-1/4", the
difference is 1/2" — shift the frame half the difference, 1/4",
toward the long diagonal, and re-measure until the two numbers match.
- Install the rim joists around the perimeter. Each rim board sits on
the outermost edge of the mud sill, face-nailed through from the
outside, then toenailed down into the mud sill from the inside.
- Pull joist layout. Hook your tape on the outside face of the rim
joist, mark every 16 inches, then come back 3/4" and square a line with
an X on the side the joist covers. The 3/4" setback centers each
1-1/2"-thick joist on the 16-inch grid, so sheet goods break mid-joist.
- Set the joists. Cut each joist, stand it on its line covering the
X, and face-nail it through the rim joist from outside. Toenailing each
joist down into the mud sill as well is the stronger job.
Pro tip: The half-the-difference rule
is worth internalizing: the racking correction is always half of what the
diagonals disagree by, because shifting one corner moves both measurements
toward each other at once.
Electrical, plumbing, and structural work may be regulated where you live — check local code before you start, and note that a permit may be required. More in our disclaimer.